Conceptual Budget Analysis - The conceptual
Budget Analysis can project the cost of a proposed building design before the first line
is drawn or specification written....in only 24 HOURS. The
Conceptual Budget Analysis provides architects, contractors and owners with the current
construction cost of a proposed building project based upon conceptual design data. A
Conceptual Budget Analysis starts with the submission of project information. This
information is then entered into our database which calculates the quantities of all
construction tasks. The type, size, design and quality of the intended structure is taken
into account when deriving the construction costs. Labor and material costs are adjusted
according to the projects zip code location. This step-by-step process results in a report
to you which provides a cost breakdown by building system. This service is also available
for Conceptual Site Analysis. To make this service as quick as
possible, you can now submit a conceptual budget analysis by filling out a form on this
web site.To obtain a conceptual analysis on a building and / or site plan, contact Building Evaluations.
Preliminary Design Estimate - The Preliminary Design
Estimate is an accurate measurement of costs during the design development stage - before
bidding document decisions are made and design costs incurred.
Measurements are taken of all construction tasks shown on drawings and described in
project specifications. The dimensions are entered into our database and quantities of all
construction tasks are calculated. Our report to you provides a detailed analysis and
summary of material and labor costs for each stage of construction. Typically, a Building
Evaluations Preliminary Design Estimate is completed within 5 working days from receipt of
plans and specifications. This service is also available for Preliminary Design Site
Analysis. For information, contact Building Evaluations.
Final Cost Estimate - When you send us
your Construction Documents, you will receive a comprehensive Multi Page Report. Our Final
Estimate is offered in C.S.I., Trade and Systems Formats. Mark-ups can be shown
separately. Sectionalization by phase of work is also available. When preparing a Final
Estimate, a detailed quantity take-off of all items shown on your drawings and
specifications is performed. These items and dimensions are then entered into our database
which contains costs for more than 25,000 individual building components, plus labor wage
rates and productivity figures for the 22 building trades that install these materials.
Typically, a Final Estimate can be completed within 10 working days upon receipt of
drawings and specifications. For more information, contact
Building Evaluations.
Other Cost Control Services
-Value Engineering
-Change Order Analysis
UNIT COST DATA
-Unit Cost Data Book (16 divisions)
SCHEDULING
-(CPM) Critical Path Method
OTHER SERVICES
-Expert Testimony (when cost is question?)
-Material Studies
-Seminars
|